Aug 27, 2022     22-5: Left flap deburr, prep, prime and dimple. - (7.0 hours)       Category: 22: Flap
Got all of the flap parts deburred this morning and then cleaned the shop.

8/28: preppped and primed all of the flap pieces in two batches. What a difference a new gun makes. I guess I'll try to do a better job of keeping this one clean.

Got the DRDT2 out and dimpled the skins and leading edges. Dimpled the remaining ribs and spar with the squeezer. Not much for photos today, just a big pile of parts. Ready to start assembly though.

9/1: using masking tape prior to etching is a mistake. Acid gets under the tape and stays. When I pulled the tape, there was a lot of corrosion on the flap brackets. Had to remove it all and went ahead and primed them.


 